PRE-QUALIFICATION FAQ
 |
| |
|
|
How
long does the Pre-qualification process take? The
Pre-qualification process takes on average approximately two (2) weeks. |
| |
|
|
What
needs to be done to be given consideration for pre-qualification in
specific areas of work? Documented,
relevant experience must be provided in order to be given consideration
for pre-qualification in specific areas of work. |
| |
|
|
What
do I/my company need to provide in order to become eligible to bid as a
Prime Contractor with the Vermont Agency of Transportation? To
become eligible to bid as a Prime Contractor with the Vermont Agency of
Transportation, the Agency requires all Contractors to be pre-qualified a
minimum of five (5) working days prior to the opening of bids for the
project(s) on which a Contractor intends to bid. |
| |
|
|
Does
the entire Questionnaire have to be filled out in order to be considered
for pre-qualification?
Yes.
In addition please note that Page 8 of the Questionnaire MUST
be filled out by the business seeking pre-qualification. |
|
|
|